How does a turnkey medical gas project work?
From the architectural plan to leak testing: Senamed’s five-step turnkey procedure in line with HTM 02-01.
Senamed delivers medical gas design matched to the architectural plan, turnkey ICU, patient room and operating room installations, and copper pipework design and installation from a single source.
Five steps
- 1. A medical gas design compliant with HTM 02-01 is prepared.
- 2. The medical copper pipeline is laid.
- 3. Floor control panels are installed, tested and handed over.
- 4. After the infrastructure handover, the products designed with the client's approval are installed.
- 5. All systems and devices are leak-tested and cross-tested before handover.
A real example
The 1,200 m² renovation of the intensive care floor at Dokuz Eylül University Hospital followed this process and was completed in 5 months in a live hospital. See the case study for photos of every stage.