Dokuz Eylül University Hospital ICU Renovation
The intensive care floor of Dokuz Eylül University Hospital was renovated to raise patient safety and hygiene standards.
Renovation in a live hospital, with one contractor
Construction, architectural renovation, mechanical installation, electrical systems, medical gas infrastructure and medical equipment installation.
The entire project was completed in a live hospital with minimum disruption.
Renovated departments
- 10-bed ICU · level 3 neurology
- 6-bed ICU · level 3 neurology
- 8-bed ICU · level 3 internal medicine
- 5-bed ICU · level 3 chest diseases
- Contact isolation rooms
- Medication preparation, blood gas, panel room and support areas
Five stages from design to handover
-
01
Planning and design
Defining project requirements and preparing plans and technical solutions.
-
02
Strip-out and site preparation
Removing existing structures and preparing infrastructure for renovation.
-
03
Infrastructure installation
Installing mechanical, electrical and medical gas infrastructure to standard.
-
04
Equipment installation and integration
Installing all medical and technical equipment in the ICU and integrating the systems.
-
05
Final checks and handover
Completing testing, quality control and project handover.
Equipment manufactured by Senamed
Planning a similar renovation?
Share the number of beds, the department and the existing infrastructure, and we will review your project together.
Talk to our engineers about your project.
Use the same form for single products and accessories or for turnkey projects; your request is routed to the right team.